top of page

OPG Nuclear Utility Bridges, Pickering Ontario

Writer: burncomfg
burncomfg
May 13, 2005
1 min read

Updated: Apr 28, 2021

Scope: Fabrication of Heavy Cable Tray Bridge designed in Galvanized HSS. 1,050 Tonnes

Project Name: Ontario Power Generation Utility Bridges

Project Owner: OPG Location: Pickering, Ontario

  • Pickering_Nuclear_Masthead
  • OPGBurncotruss
  • Utility Tray Bridge
  • OPG Tray Bridge

Pickering Nuclear has six operating CANDU® (CANadian Deuterium Uranium) reactors. The station has a total output of 3,100 megawatts (MW) which is enough to serve a city of one and a half million people, and about 14 per cent of Ontario’s electricity needs.

The power Pickering generates is safe and reliable, and virtually free of greenhouse gas emissions, so it’s helping Canada meet its climate change targets.

Comments


Burnco Mfg.

© 2017 by Burnco Manufacturing Inc. 

bottom of page