Scope: Fabrication of Plate Girders for North and South Bridges (558 Tons)

Project Name: Pine Valley Pedestrian Bridges

Project Owner: Vaughan Development Engineering & Infrastructure Planning

Location: Pine Valley Drive, Vaughan, ON

Consultant: TMIG (The Municipal Infrastructure Group Ltd.)

June 18, 2018

Scope: Fabrication of 110 Plate Girders in 2 Phases (790 Tons)

Project Name: Morningside Avenue Bridge

Project Owner: City of Toronto

Location: Morningside Avenue over Highland Creek

Consultant: MMM Group

June 22, 2017

Scope: 1,000 Tonnes structural steel trapezoidal box girder bridge

Project Name: MTO Highway 401 Hurontario St. Steel Bridge Construction

Project Owner: Ministry of Transportation, Ontario

General Contractor: Dufferin Construction
Location: Hurontario St. at Highway 401, Mississauga,
Ontario
Consultant: MMM Group

May 31, 2017

Route 11 & 15 Overpass
Burnco Mfg will be involved in the steel fabrication for a bridge linking new Route 11 with Route 15, supplying fabricated steel in excess of 700 Tonnes by truck and rail. Completed girders are in excess of 185 meters long.

This project for the Province of New Brunswick is part of the Route 11 realignment, estimated at $500 million. The bridge allowance is in excess of $48 million.

March 27, 2017

Steel Bridge Girders for replacement of Hwy 401 underpass Ingersoll, Ontario

February 13, 2017

The Peace Bridge in Fort Erie to receive an $80 million refresh

September 30, 2016

Building a Bridge for the Transportation Gap

Since the early 1990s planning studies have been undertaken to review the transportation corridor in Durham Region. The conclusion: a new east-west transit corridor was needed. Recommendations outlined that a new corridor extend to Highway 35/115 adjoining the existing Highway 407.

Additional north-south links to Highway 401 were also recommended.

This new transportation corridor will...

July 24, 2015

Scope: Supply & Install 600 Tonnes structural steel 

Project Name: Highway 407 Extension M45 Bridge
Project Owner: Highway 407 Consortium
Location: Whitby, Ontario
Consultant: 407 ETR

May 30, 2015

Scope: Supply & Install 1,000 Tonnes of structural steel curved plates

Project Name: Highway 407 Extension W9 Bridge
Project Owner: Highway 407 Consortium
Location: Whitby, Ontario

October 15, 2014

Scope:  200 Tonnes structural steel tapered plate Girder Bridge

Project Name: MTO Highway 406 Bridge at Glendale Avenue
Project Owner: Ministry of Transportation, Ontario

Location: Highway 406 at Glendale Avenue, St. Catharines, Ontario
Consultant: McCormick Rankin